
Our projects
Singida Gold Project
Project overview
Dedicated specialized Blast-Hole Drilling operations for Shanta Mining’s Singida Gold Mine. Fema Mining provides precision production drilling and pre-split highwall stabilization across open-pit mine benches, deploying our specialized Sandvik and Epiroc drill fleet with certified drill operators to achieve accurate hole depths and optimal burden-spacing patterns for mining production.
Scope of work
- Specialized production blast-hole drilling for open-pit mining benches
- Pre-split and buffer line drilling for highwall rock face stability
- Automated drill pattern alignment and hole depth quality assurance
- Round-the-clock drill rig availability with dedicated on-site technicians
- Comprehensive drilling telemetry and penetration rate monitoring
Project highlights
- Specialized exclusively in high-precision blast-hole drilling
- Deployment of Sandvik Pantera and Epiroc FlexiROC drill rigs
- Strict adherence to international blast pattern safety standards
- Certified Tanzanian drill rig operators and field technicians
Equipment deployed
- Sandvik Pantera DP1510i Top-Hammer Drill Rigs
- Sandvik Pantera DP1500i Drill Rigs
- Sandvik Rig 1100 Surface Drill Rigs
- Epiroc FlexiROC T45 Drill Rigs
- Epiroc FlexiROC D45 Down-The-Hole (DTH) Drill Rigs
- Dedicated Mobile Drill Support & Compressor Maintenance Units
Your next project
Machinery. Expertise.
Ready to mobilize.
Partner with FEMA for contract mining, precision drilling, civil earthworks and heavy equipment hire across Tanzania.
Request a project proposal