Our projects

Buckreef Gold Project

Project overview

A comprehensive flagship contract encompassing full-scope open-pit Contract Mining, Precision Blast-Hole Drilling, and Controlled Blasting for Buckreef Gold. Fema Mining executes large-scale overburden pre-stripping, bench drill-and-blast operations, and Run-of-Mine (ROM) ore haulage directly to the processing plant, deploying our high-capacity CAT and Liebherr heavy fleet backed by certified Tanzanian mining personnel.

Scope of work

  • Turnkey open-pit contract mining & bulk overburden pre-stripping
  • Production blast-hole drilling across multiple open-pit benches
  • Precision controlled blasting & optimal rock fragmentation
  • Run-of-Mine (ROM) gold ore loading and haulage to processing facilities
  • Pit dewatering, haul road grading, and environmental dust suppression

Project highlights

  • Full-scope integrated operations: Mining, Drilling & Blasting
  • Guaranteed 90%+ mechanical equipment availability on deployed plant
  • Zero Lost Time Injuries (LTI) maintained across all active shifts
  • 100% compliant with Tanzanian Mining (Local Content) Regulations

Equipment deployed

  • Caterpillar 374, CAT 350, CAT 336 & CAT 320 Excavators
  • Liebherr R 945 & Liebherr R 930 Heavy Excavators
  • Caterpillar D8R GC Heavy Bulldozers
  • Caterpillar 740 & Komatsu H400 6x6 ADT Dump Trucks
  • Sandvik Pantera DP1500i & DP1510i Drill Rigs
  • SEM Grader 919 & Komatsu GD-655-5 Motor Graders
Browse all projects

Your next project

Machinery. Expertise.
Ready to mobilize.

Partner with FEMA for contract mining, precision drilling, civil earthworks and heavy equipment hire across Tanzania.

Request a project proposal