Our projects
Buckreef Gold Project
Project overview
A comprehensive flagship contract encompassing full-scope open-pit Contract Mining, Precision Blast-Hole Drilling, and Controlled Blasting for Buckreef Gold. Fema Mining executes large-scale overburden pre-stripping, bench drill-and-blast operations, and Run-of-Mine (ROM) ore haulage directly to the processing plant, deploying our high-capacity CAT and Liebherr heavy fleet backed by certified Tanzanian mining personnel.
Scope of work
- Turnkey open-pit contract mining & bulk overburden pre-stripping
- Production blast-hole drilling across multiple open-pit benches
- Precision controlled blasting & optimal rock fragmentation
- Run-of-Mine (ROM) gold ore loading and haulage to processing facilities
- Pit dewatering, haul road grading, and environmental dust suppression
Project highlights
- Full-scope integrated operations: Mining, Drilling & Blasting
- Guaranteed 90%+ mechanical equipment availability on deployed plant
- Zero Lost Time Injuries (LTI) maintained across all active shifts
- 100% compliant with Tanzanian Mining (Local Content) Regulations
Equipment deployed
- Caterpillar 374, CAT 350, CAT 336 & CAT 320 Excavators
- Liebherr R 945 & Liebherr R 930 Heavy Excavators
- Caterpillar D8R GC Heavy Bulldozers
- Caterpillar 740 & Komatsu H400 6x6 ADT Dump Trucks
- Sandvik Pantera DP1500i & DP1510i Drill Rigs
- SEM Grader 919 & Komatsu GD-655-5 Motor Graders
Your next project
Machinery. Expertise.
Ready to mobilize.
Partner with FEMA for contract mining, precision drilling, civil earthworks and heavy equipment hire across Tanzania.
Request a project proposal