Deploying an expanded heavy excavator, drill rig, and haul truck fleet, Fema Mining achieved record monthly waste stripping and ore haulage volumes at the Buckreef Gold Project in Katoro, Geita.
Through disciplined shift planning, continuous haul road grading, and preventative equipment servicing, the Fema Mining operations team at Buckreef Gold achieved record monthly production figures without a single Lost Time Injury (LTI). The turnkey scope spans bulk overburden mining, high-precision bench drilling, controlled blasting, and Run-of-Mine (ROM) ore movement.

