Project Operations

Integrated Mining, Drilling & Blasting Operations Deliver Record Production at Buckreef Gold

12 August 2025

Deploying an expanded heavy excavator, drill rig, and haul truck fleet, Fema Mining achieved record monthly waste stripping and ore haulage volumes at the Buckreef Gold Project in Katoro, Geita.

Through disciplined shift planning, continuous haul road grading, and preventative equipment servicing, the Fema Mining operations team at Buckreef Gold achieved record monthly production figures without a single Lost Time Injury (LTI). The turnkey scope spans bulk overburden mining, high-precision bench drilling, controlled blasting, and Run-of-Mine (ROM) ore movement.

Back to news

Your next project

Machinery. Expertise.
Ready to mobilize.

Partner with FEMA for contract mining, precision drilling, civil earthworks and heavy equipment hire across Tanzania.

Request a project proposal